Massive progress for Decs, Lloyd and the team.
With the launch of Matuku and Wind Spirit, B63’s hull was moved into the main production area and her hull and cabin superstructure were joined.
With that complete, the girls and boys could start fabricating and installing all the interior components such as stairs, bulkheads and the base structures for the furniture.
The boat has progressed a great deal, to such a stage that the fairing is complete on the cabin exterior and hi-build has been sprayed on the cabin coamings and most of the interior.
1/7
2/7
3/7
4/7
5/7
6/7
7/7